.jpg)
Install HydroPlus
1. Install your Berry Floor underlay.
2. . Install your HydroPlus floor (check to make sure that the HydroPlus logo is on the tab on the BerryLOC® system).
3. After the entire floor surface has been installed, you must use Berry Floor Filler Twine (joint sealing strip) to:
- fill in the expansion joint or the gaps between the floor and the wall
- - fill in the expansion joint or the gaps between the floor and the technical profiles
- fill in the expansion joint and any gaps under door frames and around pipes.
4. Fill in the expansion joints by applying the Berry Floor Silicone (sealing kit) over the Filler Twine.
5. Installing HydroPlus accessories: place the glue on the back of the HydroPlus skirting board or scotia and stick the product to the wall, making sure that the wall is dry and free of dust or loose material.
|
|